Annual Maintenance Plan Details

comfort club plan details 600x350
All plans below include VIP priority service - so if your equipment happens to go down during a busy time, your service call goes to the top of the list. We go to your home first! Also you will receive 10% off any repairs that are needed.

Benefits of the R&R Comfort Club

 

Details of the Plans

Plans are flexible and custom tailored to your specific needs. Choose the plan(s) below that works best for you:


gas furnace 200x230

PLAN A - Gas Furnace

  • Clean and adjust automatic controls. Clean burners.
  • Adjust combustion for optimum fuel efficiency.
  • Lubricate as needed.
  • Test for combustion leaks.
  • Check blower belt wear, tension and alignment.
  • Check flue for satisfactory operation.
  • Test safety shutoff response.
  • Check gas connections for leaks.
  • Inspect heat exchangers for cracks.

interested in this plan 300x40



air conditioner 200x230

PLAN B - Air Conditioner

  • Clean condenser coil if necessary.
  • Check electrical connections for tightness.
  • Adjust system for optimum cooling.
  • Check for coil and refrigerant leaks.
  • Check safety devices.
  • Check blower belt wear, tension and alignment.
  • Check expansion valve and coil temperatures.
  • Check refrigerant level.
  • Check condensation drain.
  • Lubricate as needed.

interested in this plan 300x40



heat pump 200x230

PLAN C - Heat Pump

  • Lubricate as needed.
  • Check defrost cycle and reversing valve operation.
  • Adjust air volume for maximum efficiency.
  • Check safety devices.
  • Check electrical connections for tightness.
  • Check blower belt wear, tension and alignment.
  • Check for oil and refrigerant leaks.
  • Test electrical controls for proper operation.
  • Check refrigerant level.
  • Check refrigerant controls and coil temperature for maximum efficiency.

interested in this plan 300x40



electric furnace 200x230

PLAN D - Electric Furnace

  • Clean and check automatic controls.
  • Check all wiring for loose connections and condition of insulation.
  • Check supply voltage.
  • Check amperage draw.
  • Lubricate as needed.
  • Test safety shutoff response.
  • Check blower belt wear, tension and alignment.

interested in this plan 300x40



air cleaner 200x230

PLAN E - Electric Air Cleaner

  • Inspect cells and pre-filters.
  • Check contact points.
  • Chemically clean cells and pre-filters.
  • Check ionizer wires.
  • Adject cell plates for proper spacing.

interested in this plan 300x40



humidifiers 200x230

PLAN F - Humidifier

  • Replace media pad.
  • Inspect / Clean drain system.
  • Clean water pan and float.
  • CHeck solenoid, heater and motor.

interested in this plan 300x40



fireplaces 200x230

PLAN G - Fireplace

  • Clean glass.
  • Adjust log placement.
  • Clean pilot and burner assemblies.
  • Check all gas connections.
  • Inspect accessible vent system.
  • Check wiring connections.
  • Test fan on/off operation.

interested in this plan 300x40